U.S. Federal Courthouse / U.S. Post Office

New Federal Courthouse and U.S. Post Office in downtown Lynchburg occupies a full city block at 11th, 12th, Clay, and Court Streets. This was a $15M project. Hurt & Proffitt provided all surveying (topo, boundary, ALTA, construction), site planning and grading, stormwater management and erosion control, environmental engineering including Phase I and II site assessments, … Read more

Fort Lee Child Development Center (Design-Build)

Hurt & Proffitt is working with AECOM Design and Homeland Contracting Corporation on their second construction contract under an Army MATOC contract. This project is for a medium-size Child Development Center and Youth Services Building design-build construction project at Fort Lee, Virginia.   Hurt & Proffitt is providing civil engineering site design from the Norfolk … Read more

Fort Pickett – USACE Boundary Survey

Hurt & Proffitt, Inc. is currently under contract with Parsons Brinckerhoff (Norfolk, Virginia) to provide a Boundary Survey of the entire Main Reservation and Reservoir areas of the Fort Pickett – Army National Guard – Maneuver Training Center. Parsons Brinckerhoff is under direct contract with USACE. The survey includes approximately 58 miles of perimeter boundary … Read more

Fort Eustis Battalion Headquarters Building

Hurt & Proffitt is part of design-build team led by general contractor Homeland Contracting Corporation that also includes lead design firm AECOM Design (f/k/a HSMM/AECOM). The design-build team was awarded a design-build project to construct a two-story 14,000 SF Battalion Headquarters Building at Fort Eustis, Virginia. The project award was the first under the multi-million … Read more

Camp Allen Base Housing MUH PPV

The United States Navy selected our Norfolk Office as part of the design build team for the Camp Allen Base Housing MUH PPV. The project included all site grading as well as the building pad for a 1M SF building and thirty-seven (37) manor homes. Utility lines included 4,185 LF of storm drain pipe, 2240 … Read more

Langley Air Force Base – Hospital Additions

The United States Department of Defense selected our Norfolk Office as part of the design build team for the Langley Air Force Base Hospital Additions & Alterations. The project consisted of surveying a 150,000 SF medical building addition in the Langley Air Force Base on Nealy Avenue. Hurt & Proffitt provided building control lines, pile … Read more