The expansion provided team locker rooms, meeting rooms, offices, and handicap access to the existing stadium seating. The location of a new 5,500 square foot building was determined by incorporating right-of-way expansion plans for the street adjacent to the site and the desired proximity to the field and stadium seating. Existing irrigation and waterlines were routed around the new building and new waterline connections and meters were approved by the City of Norfolk.
Hurt & Proffitt provided the topographic survey, CAD drawings, construction administration, and stakeout services. Construction materials were reviewed prior to purchase and field engineering support was provided to resolve conflicts on site during construction.