Hurt & Proffitt, Inc. provided sub-consultant services for the project. Hurt & Proffitt prepared design drawings and specifications for bidding and for submittal of E&S permits. The project consists of a water collection facility to capture water from two existing athletic fields – one grass, one synthetic. Collected water is reused to irrigate the grass field. Water from the existing fields is collected in 2000 gallon tanks and pumped to a larger 40,000 gallon tank for irrigation. Up to 3 wells, 350 – 400 feet, will be installed to supplement the water collected from the field runoff. Hurt and Proffitt provided construction administration for site activities.