Tangier Wastewater Treatment Plant Repairs

The Project consisted of evaluation of failed and failing conveyance and treatment equipment at an existing, remotely located, wastewater treatment plant and design and implementation of required equipment replacements to maintain permit compliance.  The work included site visits to evaluate the equipment; preparation of a Preliminary Engineering Report detailing the problems, the various alternatives for … Read more

Maury Water Authority – Enfield Water Line

Hurt & Proffitt provided the design to replace 5,011 LF of 16″ water line of failing water transmission line from the Maury Service Authority water treatment plant to the Enfield Water Tank.  Close coordination was required with VDOT to allow open cutting of the entire length of Bell Road to allow installation of the pipe … Read more

Campbell County USA Water Improvements PER

In 2008 Campbell County Utilities & Service Authority selected H&P for a term contract with an unspecified length of time. The contract covers water and sanitary sewer projects the Authority is considering. The CCUSA Board of Directors approved a new project in which H&P will prepare a Preliminary Engineering Report (PER), Environmental Review Record (ERR) … Read more

Tangier Public Water Meter Installation

The project consists of installing new water meters for all existing service connections on the island. There are approximately 305 ¾” service connections, six (6) 1” service connections, three (3) 1.5” service connections, two (2) 2” service connections, and one (1) 3” service connection. All meters will be installed in new meter yokes and boxes … Read more

Tangier Water Tank Rehabilitation

The project consists of interior and exterior cleaning and coating, miscellaneous tank repairs and modifications, and related construction activities for a 150,000 gallon elevated water storage tank.  Additive bid items include AWWA/OSHA ladder and safety climb device for the tank exterior, shell/roof access, and tank interior; replacing the riser manway and installing primary and secondary … Read more

Town of Goshen PER and Water System

Hurt & Proffitt prepared the Preliminary Engineering Report (PER) to replace 12,500 LF of existing water line with new water line and resolve other water system issues. The PER qualified the Town with $3M for grant and low-interest loan funding from state and federal agencies for improvements to all phases of the water system. This … Read more

Town of Boones Mill – Water System

Hurt & Proffitt, Inc. was selected by the Town of Boones Mill to prepare the Preliminary Engineering Report dealing with lost potable water and metering of all water sold by the Town. The PER was completed to the standards of Rural Development and Virginia Department of Health. Funds granted to Boones Mill total $3.4 million.

College Hill Water Treatment Plant

Hurt & Proffitt, Inc., worked in conjunction with Craddock Cunningham Architectural Partners, and Master Engineers and Designers to prepare a master plan for the City of Lynchburg’s College Hill Water Treatment Complex. Civil engineering, a topographic survey, geotechnical, and environmental investigations were provided for the plan which defined buildings and site requirements, in addition to … Read more

Charlotte Court House Water System Improvements

The improvements will consist of replacing over 35,000 LF of old 4″ cast iron pipes with new 8″ PVC. Other components still to be completed include more water lines, deep wells, new pumps, and fire hydrants. Hurt & Proffitt started the process in July, 2005. We prepared the following: 1.  Preliminary Engineering Report (PER) in … Read more

American Electric Power

Hurt & Proffitt, Inc. has worked for American Electric Power (AEP) since 2004, completing over 30 separate projects. Some of the projects completed include: Bradley/Tams Mountain, Patriot Centre, and Southridge Transmission Lines; Jacksons Ferry, Max Meadows, and Wyoming Stations; and expansions at Clerarbrook, Ingles, and Starkey Stations. In 2009, AEP renewed Hurt & Proffitt’s annual … Read more

37 Mile Gas Line – Richlands to Honaker

Hurt & Proffitt provided survey of the proposed route of a new 37 mile transmission line. The route surveyed ran from Richlands to Honaker, VA. Hurt & Proffitt worked with the Patton Harris Rust & Associates, PC, on this project owned by Equitable Productions. It was completed within three months. Hurt & Proffitt provided topographic … Read more

AEP – Smith Mountain Lake Conservation Easement

Hurt & Proffitt performed a boundary replacement survey of approximately 5,000 acres near the Smith Mountain Lake Hydro Plant. All existing monuments were recovered and/or established, iron pins were set at corners where there were no monuments or where monuments were disturbed, and all boundary lines were flagged and painted. This property, currently leased by … Read more