Tangier Public Water Meter Installation

The project consists of installing new water meters for all existing service connections on the island. There are approximately 305 ¾” service connections, six (6) 1” service connections, three (3) 1.5” service connections, two (2) 2” service connections, and one (1) 3” service connection. All meters will be installed in new meter yokes and boxes except the 3” meter, which will be installed on a 3” copper domestic water line inside the mechanical room of the school. 

The project also includes replacing one (1) 6” gate valve at the fire hydrant near the north end of the runway. The base bid for the project includes touch read water meter interfaces with associated equipment required to read the meters and generate customer billing statements. Other additive bid items include hand-held radio reading meters and equipment, vehicle-based radio reading meters and equipment, fixed-base radio reading meters and equipment, and water billing software.