College Hill Water Treatment Plant

Hurt & Proffitt, Inc., worked in conjunction with Craddock Cunningham Architectural Partners, and Master Engineers and Designers to prepare a master plan for the City of Lynchburg’s College Hill Water Treatment Complex. Civil engineering, a topographic survey, geotechnical, and environmental investigations were provided for the plan which defined buildings and site requirements, in addition to space and functionality needs.

Parking and access points, vehicle circulation, building locations, preliminary grading and erosion control requirements were evaluated along with storm water quality and quantity requirements and measures necessary for local and state approval. Hurt & Proffitt also evaluated utility requirements for water and sanitary sewer, and existing site features including retaining walls, to determine the need for replacement, repair or removal.