Hurt & Proffitt prepared an existing condition survey of key structural elements on the pond side of existing Scope Arena. The data gathered was needed to support the installation of a new rigging system being installed by contractors. The survey required that control baselines be established inside as well as outside the building. The surveyors established locations on the roof structure for the contractor to drill holes through the concrete structure for the installation of anchor bolts.
Hurt & Proffitt provided control baselines, existing condition surveys, and construction layout.